Incorrect installation or lack of skills and knowledge about the solution, when running-in and adjusting a scale can easily result in a lack of profit and waste of valuable productivity.

Jesma’s in-house team of engineers mechanical and automation, technicians have the know-how and experience to ensure that installation and commissioning passes without an issue.

An advantage of having Jesma handle the running-in period is that the running-in period is minimized, meaning less downtime for installing or replacing equipment.

FAT/SAT – Make sure your weighing solution runs at maximum capacity

Control Cabinet Micro dosing

Factory Acceptance Test

Your equipment is mechanically and electrically tested at Jesma. To ensure that all systems, communications, and components are working as they should.

Do you want to participate in FAT at Jesma?

  • Get an offer for FAT
  • Get help for bookings

 Site Acceptance Test – Commissioning

To ensure maximum uptime from day one, it is important that the system is installed and fine-tuned correctly from the beginning.’

For the SAT test, a Jesma technician participates on-site in connection with start-up of the equipment at the customers facility. During the on-site visit, the Jesma technician will evaluate the electrical and mechanical installation, calibration, and connections as well as assist in testing the operation of the system.

Book Jesma for SAT test?

  • Get an offer for SAT
  • Get help for bookings